Project Overview
Relay settings review, developed detailed test plans, and performed on-site testing using an Omicron CMC 356 test set for a 12kV recloser. Our efforts ensured full compliance with PG&E Rule 21 requirements.
- SEL-751 Relay
- Beckwith M-7679 Controller
Protection Elements Tested:
- Metering Check
- Maximum Phase Time-Overcurrent Element (51P1T)
- Phase Instantaneous Overcurrent Element (50P1T)
- Neutral Ground Time-Overcurrent Element (51N1T)
- Neutral Ground Instantaneous Overcurrent Element (50N1T)
- Arc-Flash Protection Elements
- Sync Check
- Phase Under/Overvoltage Elements
- Residual Overvoltage Element
- Over/Under Frequency Element



Latest Projects
Sugar Processing Plant
Relay settings, test plans, and on-site testing for induction generators, ensuring SDGE Rule 21 compliance.
Read More
BioMAT Power Plant
Relay settings review, test plans, and on-site testing for 12kV Recloser, ensuring PG&E Rule 21 compliance.
Read More