Site/Factory Acceptance Test

Factory Acceptance Test (FAT)

Minimize your risk of system failures with our FAT services, ensuring your protection and control systems meet all requirements before and after installation.

We help identify potential issues early, enabling timely corrections before shipment and reducing the risk of delays during installation.
  • FAT Planning and Scheduling

  • Scope Definition and Test Criteria Development

  • FAT Test Plans and Procedures Development

  • Identification of Roles and Responsibilities (Owner, Vendor, Witnessing Team)

  • FAT Execution and Monitoring

  • Documentation and Reporting

  • Vendor and Contractor Coordination

  • FAT Test Tools and Equipment Provision

  • FAT Quality Assurance and Compliance Verification

Site Acceptance Test (SAT)

Minimize downtime and ensure a smooth startup with our SAT services, verifying proper equipment operation after installation.

We ensure your systems operate flawlessly with our SAT services:
  • On-Site Equipment Testing
  • System Integration Verification
  • Field Operation Confirmation
  • Compliance with Specifications and Standards
  • Protective Relay and Control System Testing
  • Relay Settings Validation
  • Issue Identification and Resolution
  • Test Result Documentation
  • Risk Reduction and Smooth Handover
  • System Readiness Confirmation

Safety Is at the Heart of Everything We Do.

Latest Work

Sugar Processing Plant

Sugar Processing Plant

Relay settings, test plans, and on-site testing for induction generators, ensuring SDGE Rule 21 compliance.
Read More
BioMAT Power Plant

BioMAT Power Plant

Relay settings review, test plans, and on-site testing for 12kV Recloser, ensuring PG&E Rule 21 compliance.
Read More