Project Overview

Relay settings development, test plan creation, and on-site testing services using an Omicron CMC 356 test set for two induction generators. Additionally, facilitated utility interconnection to ensure full compliance with SDGE Rule 21 requirements.

  • SEL-751 Relay
  • SEL-700G Relays

Protection Elements Tested:

  • Metering Check
  • Phase Time Overcurrent (Voltage Restraint) Element (51V1T)
  • Phase Instantaneous Overcurrent Element (50PX1T)
  • Residual Ground Time-Overcurrent Element (51G1T)
  • Residual Ground Instantaneous Overcurrent Element (50G1T)
  • Under/Overvotlage Protection Elements
  • Under/Over Frequency Protection Elements
  • Reverse Power Protection Elements

Share:

Let's Discuss Your Project!

Latest Projects

Sugar Processing Plant

Sugar Processing Plant

Relay settings, test plans, and on-site testing for induction generators, ensuring SDGE Rule 21 compliance.
Read More
BioMAT Power Plant

BioMAT Power Plant

Relay settings review, test plans, and on-site testing for 12kV Recloser, ensuring PG&E Rule 21 compliance.
Read More

Safety Is at the Heart of Everything We Do.

Scroll to Top